When will the Fehmarn Belt tunnel between Denmark and Germany open?

The new link to Germany

Answered at: Checked at:

Short answer

The Fehmarn Belt tunnel is not open yet: as of November 2026 the 18 km immersed tunnel between Rødbyhavn and Puttgarden is still under construction. Building began in 2020 on the Danish side and in 2021 on the German side, and the first tunnel element was placed off the Danish coast in May 2026. In November 2026 the placing of the fifth element was postponed until a rubber seal is repaired. When the tunnel is finished, the crossing will take 7 minutes by train and 10 minutes by car.

Transport and mobility

Why

  1. Until it opens, direct trains to Hamburg run via Odense, Kolding and Padborg.
  2. It will be the longest immersed tunnel in the world.
  3. It is funded by loans and will be paid for by its users.

Details

All installations in the tunnel will be tested before it opens.

Tip

Plan trips to Germany with today's routes, as the tunnel cannot be used yet.

What may differ

The opening date depends on construction progress and can move.

Common misconception

Many think you can already drive or take the train through the Fehmarn Belt tunnel.

What actually happens

The tunnel is still being built, and the elements are being placed one by one.

People also ask

  • How long is the train from Copenhagen to Hamburg?
  • How long is the Fehmarn Belt tunnel?
  • Is there a direct train from Copenhagen to Berlin?

Sources

This answer is for reference only. Timetables, routes and fares change, so check the operator before you travel.

Transport and mobility