Fit-out and budget: what to check before laying the first tile

By Alex Nekrashevich. Facts as of late November 2026. We revise this article as rules and our experience change.

This is for you if you have found a unit and are about to build: the tradesperson on a tight budget, the dreamer who wants it beautiful, the newcomer to Denmark and the beginner writing a first cost estimate.

The short version

Whatever you build into rented premises usually stays behind when you leave. So inspect the unit and the lease first and lay tiles later. Take your total and add half again. Choose commercial-grade plumbing and equipment rather than domestic. And keep money back: marketing and a six-month reserve still have to be paid for once the builders are gone.

1. Before the first tile

The most expensive fit-out mistakes are visible in advance. Before work starts, check:

  • Power. How many amps does the unit have? Ask the grid company what supply capacity the address has paid for and what more would cost (connection charge). We have seen a capacity upgrade come close to half the cost of all the building work.
  • Electrician. Any wiring job must be done by an authorised electrical contractor. Ask for the firm's name and CVR number and check it.
  • Extraction. Where will the duct run? In Copenhagen, restaurant exhaust air must be led above the roof ridge. In an owners' association, changes to shared parts typically need a two-thirds majority. A duct on the facade often needs the municipality's permission. One salon owner on the ground floor of a new residential block with no ventilation shaft of its own spent two months and gave up.
  • Water and drains. Turn the taps on and let them run. An old drain blocks on a single wet wipe. Moving a wet room is costly.
  • Sign and air conditioning. Under the Commercial Lease Act you may put signs on walls, doors and windows to the extent that is customary (section 39). Many local plans, however, require permission for signs, awnings and outdoor AC units. Ask the municipality.

More: Checking commercial premises in Denmark before you rent.

2. Your building work and the lease: who keeps what

Tiles, walls, wiring and windows are improvements fixed to the building. The law gives you some rights, but much depends on the lease:

  • You may carry out alterations customary for your trade if you give the landlord eight weeks' notice; the landlord can refuse if they would harm the property or other tenants (section 38).
  • For changes made with the landlord's consent, the landlord can only demand reinstatement on moving out if they reserved that right (section 75(2)).
  • Improvements you paid for with the landlord's permission are left out when your rent is later compared with market rent (section 13(6)).
  • If the landlord expands the building's supply and drain lines for tenants' benefit, that can count as an improvement justifying higher rent (section 31(7)). Put in writing who pays for extra power.

Our own case: the video studio. About 25,000 euros went into a basement in an out-of-town shopping centre: heating against damp, walls, partitions for four shooting rooms, lighting and ventilation. Eighteen months later the owner saw the result and raised the rent from 1,200 to 2,500 euros. We left and lost the deposit too. A single missing clause cost more than the entire fit-out.

Before building, the lease should cover:

  • how many rent-free months you get while building (be candid: "I can't pay full rent during the works, and everything I invest stays in your unit");
  • how long the rent is frozen after your fit-out;
  • your position if the tenancy is cut short and your money is still in the walls;
  • which party covers extra electricity capacity and fixes to shared cables and pipework.

More: Commercial lease in Denmark: 10 points to check.

3. The budget: times 1.5

First-timers count walls and machines: building work, equipment, furniture. In our experience the hidden extras swallow at least half as much again. Hence: multiply the whole estimate by 1.5.

Commonly forgotten items:

  • cleaning once the builders leave;
  • waste removal;
  • new wiring for equipment (a bakery oven can run up to 16 hours a day);
  • the sign, price labels, a few decorations and a reception chair;
  • new locks at handover;
  • small repairs after opening: sockets, taps, toilets.

Do not pour everything into the fit-out. In cafés and restaurants we often see building work and ventilation consume the entire budget, leaving nothing for marketing. You also need a reserve for at least six months of trading afterwards. More: Money for the start and the first 6 months.

4. Commercial plumbing and equipment

In a coffee bar, café or guest house the tap, toilet and mixer see many times the use they get at home. The ordinary tap that "works fine at my place" soon gives up. Commercial kit costs more, yet cheap kit keeps needing replacement, and every swap needs someone to take out the old one and fit the new.

Give the budget a line called "who does it": who handles small repairs, equipment swaps and cleaning, and at what cost? You will not manage all of it yourself.

5. Builders and timing

  • From what we have seen, a five-day promise means ten days if you are lucky. Allow plenty of time, because rent may already be running.
  • The result will only match the picture in your head if you write a detailed brief: what goes where, which colour, which sockets and how many.
  • Hold off on printing lots of signs, cards and flyers. If anything changes, you will reprint the lot.

6. Equipment: buy or lease

Bought equipment fetches far less when you close. In our experience a coffee machine later sells for a third or a quarter of its price, so leasing is usually wiser. More in Equipment: buy or lease.

7. Where not to economise

Do not cut corners on (in our experience) Why
Checking power, extraction and water before building redoing it later costs many times more
Heavy-duty plumbing and appliances home-grade fittings wear out and you keep buying new ones
A lease reviewed before the fit-out your investment may stay with the landlord, and the rent may rise
A six-month reserve after the fit-out without one, a beautiful interior closes within months

Tips by trade

Coffee bar. Water treatment and filters, power for the machine, air conditioning (the outdoor unit may need permission). Lease the coffee machine.

Café and restaurant. Power for hobs and ovens, room for strong extraction and a route above the roof. The classic slip: the fit-out and ventilation ate the budget.

Bakery and patisserie. Wiring for an oven that runs up to 16 hours a day, and extraction the upstairs neighbours will not complain about.

Hairdresser and barber. Separate ventilation, water at every station, power for equipment and dryers.

Corner shop and kiosk. Fridges and freezers running around the clock, and enough power for them.

Pet shop. Storage for feed sacks and easy deliveries.

Shoe repair and services. A small fit-out; what matters most is a sign visible from the street.

Garage and car wash. Budget for an oil interceptor, waste collection, keeping a high-ceilinged workshop warm, plus water and electricity.

Dentist and clinic. Before building and before signing, confirm the unit suits a clinic: ceiling height, ventilation, water and drains in every treatment room and space for equipment.

Hotel and guest house. Commercial plumbing, equipment tested before the season (the air conditioning at 35 degrees) and the small touches in each room.

Checklist ahead of the building work

Check How Warning sign
Power an electrician and the grid company you need ovens, but the unit only has power for lighting
Electrician an authorised contractor with a CVR number "a friend who knows about wiring"
Extraction the owners' association (two-thirds) and the municipality the duct is shared with flats and nothing is in writing
Water and drains run the taps yourself old pipes; the wet room must move
Lease rent-free months, rent freeze, your investment, section 75 the lease is silent on all of it
Budget multiply everything by 1.5 nothing left for marketing or a reserve
Equipment commercial, not domestic choosing domestic to save
Builder a detailed brief and time in hand everything agreed by word of mouth
Who does it who repairs and replaces after opening "I'll handle it myself"

Next steps

Lease checked and the budget has slack? Continue with Money for the start and the first 6 months and after that Equipment: buy or lease.

This article is not legal or financial advice. Fit-out prices vary: get written quotes.

Questions and answers

The electricity supply, the extraction route, water and drainage, and permission for AC and signage. After that, read what the lease says about your investment.

Tiles, walls, wiring and windows are fixed to the building. The Commercial Lease Act gives partial protection (sections 13, 38 and 75), but the lease matters a lot, so read it first.

We add 50% to every estimate, because the overlooked items reliably cost that much.

In a café, coffee bar or guest house taps and toilets work many times harder. Domestic kit fails quickly, and replacing it costs money and labour.

It varies. The grid company charges a connection fee for higher supply capacity. Ask for a price before signing.

An authorised electrical contractor. Check the firm before hiring it.

Often. A duct or outdoor unit on the facade typically needs the municipality's permission, an owners' association needs a two-thirds decision, and in Copenhagen restaurant exhaust must go above the roof ridge.

Ring-fence money for marketing and at least six months of running costs before ordering tiles.

Put a precise written spec in their hands: positions, colours, the number and type of sockets. Spoken agreements get remembered two ways.

In our experience roughly twice as long as promised. Remember the rent may be running meanwhile.

We can go through your location or lease with you before you sign

Prefer not to do it all yourself? Madloba Consult will look at your address on Google Maps and go through the questions in this guide with you. We do not give legal advice: a lawyer reviews the contract itself. Running a business in Denmark? What we offer and what it costs is on the page Marketing for local businesses.